Four-lane bridge construction in Damuali reaches 84% physical progress
The physical progress of a four-lane bridge being constructed over the Madi River in Damuali bazaar has reached 84 percent, with economic progress at 81.2 percent. The bridge, a first of its kind in the country with a single monolithic structure, is being built at a cost of Rs 1.21 billion. Construction is progressing rapidly, with foundation work completed and arch design underway.
4 articles
·
6 days ago