Enewspolar The Rising Nepal | Nepal's First English Broadsheet Daily.
3 sources · 3 articles
Started 4 days ago · Updated 3 days ago

Nepalgunj Road Division Office Issues 30-Day Ultimatum for Highway Encroachment Removal

Photo · enewspolar.com

The Road Division Office in Nepalgunj has issued a 30-day ultimatum for the removal of all illegal structures encroaching on the Jamunaha–Nepalgunj–Chisapani highway. This action aims to address increasing road accidents caused by the encroachments, with the Department of Roads prepared to demolish structures and recover costs if compliance is not met.

  • The ultimatum covers the 33-kilometer stretch of the highway from Jamunaha at the Nepal-India border through Nepalgunj and Kohalpur to Chisapani Bazaar.
  • Specific clearance zones are defined: 25 meters on both sides from the road center line for most stretches, and 21 meters for the section between Ganeshman Chowk and Karkado Chowk, and Kohalpur's central market.
  • The Public Roads Act 2031 prohibits permanent or temporary structures within national highway boundaries.
  • Nepalgunj Sub-Metropolitan City had already commenced phased encroachment removal for footpath construction.
  • Failure to remove structures within 30 days will result in demolition by the Department of Roads, with costs to be recovered from the responsible parties.

Timeline (3)

Share ↗
Related

More in Infrastructure

See all
Tribhuvan International Airport Inaugurates New Parallel Taxiways to Enhance Efficiency Tribhuvan International Airport Inaugurates New Parallel Taxiways to Enhance Efficiency

Tribhuvan International Airport in Kathmandu has officially put into operation a new parallel taxiway system, including taxiways 'P', 'S', and 'T'. The inauguration ceremony was jointly led by Mukunda Niraula, Secretary of the Ministry of Culture, Tourism and Civil Aviation, and Mukesh Dangol, Director General of the Civil Aviation Authority of Nepal. This infrastructure upgrade is expected to improve aircraft ground movement efficiency, reduce runway occupancy time, and increase the airport's overall operational capacity.

3 articles · 4 hours ago
Pokhara Metropolitan City Removes 105 Structures from Phirke River Encroachments Pokhara Metropolitan City Removes 105 Structures from Phirke River Encroachments

Pokhara Metropolitan City has removed 105 structures, both private and institutional, from the Phirke River banks as part of an ongoing encroachment removal campaign. The operation, which began on June 10, utilizes bulldozers and involves police and technical staff to clear structures built on the riverbed. The metropolis plans to develop the cleared riverbank into an attractive tourist destination with amenities like cycle tracks and green spaces.

6 articles · 4 hours ago
Japan-funded reconstruction begins on flood-damaged BP Highway section in Nepal Japan-funded reconstruction begins on flood-damaged BP Highway section in Nepal

Reconstruction has officially commenced on a severely damaged 3.2-kilometer section of Nepal's BP Highway, linking Kavrepalanchok and Sindhuli districts, with financial and technical assistance from Japan. Japanese Ambassador Maeda Toru and Nepal's Infrastructure Ministry Secretary Gopal Prasad Sigdel jointly laid the foundation stone for the Piple–Barkhekhola stretch, which was devastated by floods and landslides in October 2024.

10 articles · 4 hours ago
Tribhuvan International Airport Inaugurates New Taxiway System to Enhance Efficiency Tribhuvan International Airport Inaugurates New Taxiway System to Enhance Efficiency

The Civil Aviation Authority of Nepal (CAAN) has inaugurated a new parallel taxiway "P" along with associated taxiways "S" and "T" at Tribhuvan International Airport. This new taxiway system is expected to significantly improve aircraft ground movement efficiency, enhance operational safety, reduce runway occupancy time, and increase the airport's overall operational capacity.

3 articles · 5 hours ago